|
ACPD
ACPD
In Use
ACPD is used in two ways - for sizing
defects found by another method (such as MT
or PT),
or for monitoring (crack initiation at a stress hotspot or growth
of a known crack).
Crack sizing is done by manual inspection in a wide variety of
industries. It should be noted that because ACPD requires good electrical
contact with the metal surface, it is difficult to deploy in subsea
inspection applications.
Crack monitoring is often done in laboratory testing (e.g. fatigue
testing, crack initiation testing, fracture toughness tests), but
can also be on-site using permanently installed probes at critical
regions.
ACPD
Measurement / Introduction /
ACPD In Use 1 2
3 Next
|